True

 1” Water intake socket, water consumption and discharge

1.00 € 1.00 € 1.0 EUR

1.00 €

(0% Off)

Cod: AC004


Ø interno 25mm - esterno 33mmØ inside 25mm - outside 33mm
Days
Hours
Mins
Secs

    This combination does not exist.

    UNIT PRICE

    Insert Quantity

    1.00 € EUR 1.0

    VAT excluded

    Unit(s)


    Description

    The item includes the rental of the water supply system, the related water consumption and discharge, it does not include the rental of water appliances (sink, wash basin, water tap...) and their connection.
    Please note that the hall: 14 - 15 - 16- 18- 19 - 20 - 33 - 34 – 36 it is not possible to install 1” Water intake sockets.
    For a correct installation of the required systems, the exhibitor is requested to attach a plan of the stand with a clear and univocal indication of the positions of the water intake. The cost for moving an already installed water plug inside the stand is considered as a new installation and will be charged as per price list. The installation of a water socket must be requested at least 20 days before the beginning of the stand set-up works. The Exhibitor is also requested to notify the working beginning date in order to arrange for the installation of the water socket. In the event of delayed requests, Bolognafiere shall not be obliged to supply the required services.
    Note: in case of necessity of a continuous water flow in the stand, the Exhibitor must provide collecting tanks with recirculation pumps for the discharging pipes, at his own care and expenses.

    The item includes the rental of the water supply system, the related water consumption and discharge, it does not include the rental of water appliances (sink, wash basin, water tap...) and their connection.
    Please note that the hall: 14 - 15 - 16- 18- 19 - 20 - 33 - 34 – 36 it is not possible to install 1” Water intake sockets.
    For a correct installation of the required systems, the exhibitor is requested to attach a plan of the stand with a clear and univocal indication of the positions of the water intake. The cost for moving an already installed water plug inside the stand is considered as a new installation and will be charged as per price list. The installation of a water socket must be requested at least 20 days before the beginning of the stand set-up works. The Exhibitor is also requested to notify the working beginning date in order to arrange for the installation of the water socket. In the event of delayed requests, Bolognafiere shall not be obliged to supply the required services.
    Note: in case of necessity of a continuous water flow in the stand, the Exhibitor must provide collecting tanks with recirculation pumps for the discharging pipes, at his own care and expenses.

    To install this Web App in your iPhone/iPad press and then Add to Home Screen.