True

Water intake socket ¾” (water inlet and outlet)  with connection to the exhibitors own sink

1.00 € 1.00 € 1.0 EUR

1.00 €

(0% Off)

Cod: AC014


Ø interno 20mm - esterno 27mm
Ø inside 20mm - outside 27mm
Days
Hours
Mins
Secs

    This combination does not exist.

    UNIT PRICE

    Insert Quantity

    1.00 € EUR 1.0

    VAT excluded

    Unit(s)


    Description

    The item includes connection of  exhibitor's own  sink to the water mains,  the rental of the water supply system and the related water
    consumption and discharge. It does not include the rental of the exhibitor's sink etc.
    For a correct installation of the required systems, the exhibitor is requested to attach a plan of the stand with a clear and univocal indication of the positions of the water intake. The cost for moving an already installed water plug inside the stand is considered as a new installation and will be charged as per price list. The installation of a water socket must be requested at least 20 days before the beginning of the stand set-up works. The Exhibitor is also requested to notify the working beginning date in order to arrange for the installation of the water socket. In the event of delayed requests, Bolognafiere shall not be obliged to supply the required services.
    Note: in case of necessity of a continuous water flow in the stand, the Exhibitor must provide collecting tanks with recirculation pumps for the discharging pipes, at his own care and expenses

    The item includes connection of  exhibitor's own  sink to the water mains,  the rental of the water supply system and the related water
    consumption and discharge. It does not include the rental of the exhibitor's sink etc.
    For a correct installation of the required systems, the exhibitor is requested to attach a plan of the stand with a clear and univocal indication of the positions of the water intake. The cost for moving an already installed water plug inside the stand is considered as a new installation and will be charged as per price list. The installation of a water socket must be requested at least 20 days before the beginning of the stand set-up works. The Exhibitor is also requested to notify the working beginning date in order to arrange for the installation of the water socket. In the event of delayed requests, Bolognafiere shall not be obliged to supply the required services.
    Note: in case of necessity of a continuous water flow in the stand, the Exhibitor must provide collecting tanks with recirculation pumps for the discharging pipes, at his own care and expenses

    To install this Web App in your iPhone/iPad press and then Add to Home Screen.