True

COLD and HOT water connection for loading and unloading- including Boiler

1.00 € 1.00 € 1.0 EUR

1.00 €

(0% Off)

Cod: ACMF002


Days
Hours
Mins
Secs

    This combination does not exist.



    Description

    Construction of ONLY ½” hot and cold water points with shut-off valves and a discharge point with 40 mm diameter PVC pipe, all derived from the existing network in the wells and shafts (includes boiler)

    Construction of ONLY ½” hot and cold water points with shut-off valves and a discharge point with 40 mm diameter PVC pipe, all derived from the existing network in the wells and shafts (includes boiler)

    To install this Web App in your iPhone/iPad press and then Add to Home Screen.